This project comprises the Construction of a new International Terminal
Building, with new aircraft parking apron and associated landside facilities
within the existing capital city airport namely Boryspil
State International Airport at Kyiv, Ukraine. The Airport is situated
approximately 29 kilometres to the southeast of the city of Kyiv.
The project executing agency is the Boryspil
State International Airport Authority under the Council of Ministers of the
Government of Ukraine. The new terminal building and associated works have
been designed by Japan Airport Consultants Inc. of Tokyo, Japan.
The design was prepared in Kyiv. The Project is funded by a Loan from the
Government of Japan via the Japan Bank for International Cooperation (JBIC).
DCI provided full quantity
surveying, commercial and contractual management support services throughout
the basic and detailed design stages of the Project through the assignment of
senior personnel to the consultant’s project management team in Kyiv.
|
|
|
CLIENT:
Japan Airport Consultants Inc.
PROJECT SCOPE:
|
Civil Works:
|
Construction of Apron
Pavement
Construction of Interconnecting Taxiways
Construction of Roads and Surface Car Park
Construction of Forecourt Viaduct
Construction of G.S.E. Roads and Parks
Improvement of Drainage Facilities
Miscellaneous Civil Works
|
Building Works:
|
Construction of International Passenger Terminal
Building, approximate
floor area 70,000 m2 complete with all Architectural, Structural,
Mechanical and Electrical Works and with all furniture, fittings and
equipment
|
Terminal Equipment
Works
|
Baggage Handling System
Passenger Boarding Bridges
Flight Information Display System
Security Screening System
Moving Walkways, Elevators and Escalators.
|
Utility Works:
|
Surface Water Treatment System
Wells and Water
Reservoir Tank
Hot Water
Line
Airport Fuel Hydrant System
Works (pipe and hydrant pits)
Airfield Lighting Works (apron flood lights and taxiway lights)
|
|
|
|
|
|
PERIOD OF SERVICES:
Early 2006 to mid 2007.
DCI SCOPE:
QUANTITY SURVEYING SERVICES
|
|
|
Engineering Design Stage Services
|
|
|
|
|
a)
|
Preparation of PQ documents and assistance with
pre-qualification of construction contractors, including:-
|
|
|
|
|
|
- Preparing PQ documents
for international tendering, with all necessary schedules and pro-formae
- Preparing PQ
guidelines, defining the procedures for reviewing, scoring and ranking
prospective tenderers, with detailed
evaluation forms
- Preparing media
notices
- Analysing and
preparing responses to applicant’s queries
- Reviewing
applications from the legal, administrative and technical viewpoints
- Preparing detailed
PQ evaluation report
- Liaising with
client organisation and coordination of results
- Preparing response
to applicants
|
|
|
|
|
b)
|
Preparation of Draft, Final and Amendment to Final
Tender Documents including:-
|
|
|
|
|
|
- Invitation To Tenderers
- Instructions To Tenderers, defining the procedures for tendering, reviewing,
and selection of Contractor(s)
- Conditions of
Contract (using FIDIC Conditions as a basis, with General and
Particular Conditions)
- Specifications for
Workmanship, Equipment and Materials, including providing basic
reference documents to engineers, coordinating and editing
engineers’ draft documents
- Assisting with
preparation of Bills of Quantities (BOQ), including providing basic
reference documents and method of measurement to engineers,
coordinating and editing engineers’ draft documents and training/supervising
local personnel
- Preparing tender
evaluation methodology and guidelines
|
|
|
|
|
c)
|
Providing general support and assistance with:
|
|
|
|
|
|
- Preparation of
Sequence and method of construction
- Preliminary cost estimates.
- Design
coordination and revision
- Preparation of
Final Design Report
|
|
|
|
|
The DCI Services also include or require the
following:-
|
|
|
|
- Coordination
within the project team, ensuring that all technical inputs are provided
by respective engineers, reviewed, discussed and consistently applied
in the implementation of the Project and in a timely manner.
- Assisting with
external coordination, ensuring that the project team including local consultants, take consistent, effective and timely
action.
- Selection of base
documents, techniques and procedures suitable for an international
project of this type.
- Assistance with
local staff training, supervision and coordination.
- Attending
coordination and other meetings with Employer.
|
|
|
Indonesia | Philippines | Uzbekistan | Vietnam | Africa | Qatar | Ukraine
|